Commercial Concrete in Chilton, TX
Commercial concrete in Chilton, TX gets laid out, reinforced and placed by Waco Elite Concrete in the order a site goes together: the building's floor slab first, then the curb, gutter and entrance that tie the lot to the road, all priced in a free estimate.

Call or request a free estimate any time, 24/7
No charge answered 24/7
Get free estimates
Floor slab, curb line and highway entrance
By the Texas State Historical Association's account, Chilton is a mile east of U.S. Highway 77, on State Highway 7, so a business may front a state road. A new or altered entrance onto one takes TxDOT's access driveway permit, Form 1058, and no work starts in the right of way before the signed permit and 24 hours' notice.
Curb and gutter to TxDOT's spec
TxDOT's Item 529 governs curb and gutter on state work: formed sections of 50 feet at most unless approved, exposed edges rounded with an edging tool, at least 72 hours of curing, no more than 1/4 inch of drift under a 10-foot straightedge, and joints that match the pavement beside it.
The floor inside
For a shop floor that will get a hard troweled finish, air-entrained concrete is the wrong choice, says the National Ready Mixed Concrete Association: entrained air makes the top layer likelier to delaminate, so it caps air at 3%. In a warehouse, floor levelness can limit how high pallets are safely stacked.
The paving behind the curb is covered under parking lots in Chilton, and house and barn foundations under slab work; every other job is on the Chilton service list.
Call or request a free estimate any time, 24/7.
(254) 309-9254Slab, curb and entrance, in that order
Plans and the state permit
Drawings set loads and finish; a highway entrance waits on TxDOT's permit.
Floor slab and steel
Base, forms and steel go in, then the slab is placed, troweled and cured.
Curb, gutter and apron
Curb goes in short formed sections, joints matched to the paving, then cures.
Call or request a free estimate any time, 24/7.
(254) 309-9254Ready-mix by strength, curb by the foot
Ready-mix averages $119 to $147 a cubic yard nationally in 2026, delivery within 20 miles included; farther out, delivery adds $9.50 a mile. These are averages, not our prices.
- 2,500 psi
- $122
- 3,000 psi
- $124
- 3,500 psi
- $126
- 4,000 psi
- $129
- 5,000 psi
- $147
National averages, 2026, delivery within 20 miles. Not a quote.
Questions about curb, entrances and mixes
Which TxDOT district covers Falls County highways?
The Waco District, which plans, builds and maintains the state roads of Bell, Bosque, Coryell, Falls, Hamilton, Hill, Limestone and McLennan counties.
Can fibers take the place of steel in curb and gutter?
On TxDOT work, yes. Item 529 allows fibers meeting the department's DMS-4550 standard to replace reinforcing steel in Class A concrete, unless the plans say otherwise.
How is new curb and gutter priced?
By the foot, as TxDOT measures and pays it. Installed curb and gutter averages $63.32 to $77.78 a linear foot nationally (May 2026). The Waco District's average low bid for Type II curb and gutter, $15.41408 a foot in the twelve months to December 31, 2016, is a contractor's highway bid, not a retail price.